To Print Use The PDF File
LIST OF CONSTRUCTION SPECIFICATIONS AND INSTRUCTIONS FOR USE
(Numerical and Topical)
Construction Specification Name Date Specification Instructions For Use Instruction Specification Site Preparation 1. Clearing 1/97 1/97 2. Clearing and Grubbing 1/97 1/97 3. Structure Removal 1/97 1/97 4. Channel Clearing and Shaping 1/97 1/97 5. Pollution Control 10/98 10/98 6. Seeding, Sprigging and Mulching 11/97 11/97 7. Construction Surveys 11/97 11/97 8. Mobilization and Demobilization 10/98 10/98 9. Traffic Control 11/97 11/97 10. Water for Construction 10/98 10/98 Return to Top of Page Foundation Work 11. Removal of Water 10/98 10/98 12. Relief Wells 10/98 10/98 13. Piling 10/98 10/98 14. Pressure Grouting 10/98 10/98 Return to Top of Page Earthwork 21. Excavation 10/98 10/98 23. Earthfill 10/98 10/98 24. Drainfill 10/98 10/98 25. Rockfill 10/98 10/98 26. Topsoiling 10/98 10/98 27. Diversions and Waterways 11/97 11/97 28. Lime-Treated Earthfill 11/97 11/97 29. Soil-Cement 11/97 11/97 Return to Top of Page Concrete and Reinforcement 31. Concrete for Major Structures 1/97 1/97 32. Structure Concrete 1/97 11/97 33. Shotcrete 10/98 10/98 34. Steel Reinforcement 11/97 11/97 35. Concrete Repair 11/97 11/97 Return to Top of Page Non-Metal Pipe Conduits and Drains 41. Reinforced Concrete Pressure Pipe Conduits 11/97 11/97 42. Concrete Pipe Conduits and Drains 11/97 11/97 43. Clay Pipe 10/98 10/98 44. Corrugated Polyethylene Tubing 10/98 10/98 45. Plastic Pipe 10/98 10/98 46. Tile Drains 10/98 10/98 Return to Top of Page Metal Pipe Conduits 51. Corrugated Metal Pipe 10/98 10/98 52. Steel Pipe 10/98 10/98 53. Ductile-Iron Pipe 10/98 10/98 Return to Top of Page Riprap and Slope Protection 61. Rock Riprap 11/97 11/97 62. Grouted Rock Riprap 10/98 10/98 63. Treatment of Rock Surfaces 10/98 10/98 64. Wire Mesh Gabions and Mattresses Twisted (Woven) or Welded Mesh 11/97 11/97 Return to Top of Page Water Control Gates and Valves 71. Water Control Gates 10/98 10/98 Return to Top of Page Miscellaneous Structural Work 81. Metal Fabrication and Installation 10/98 10/98 82. Painting Metalwork 10/98 10/98 83. Timber Fabrication and Installation 10/98 10/98 84. Painting Wood 10/98 10/98 Return to Top of Page Miscellaneous Construction 91. Chain Link Fence 11/97 11/97 92. Field Fence 11/97 11/97 93. Identification Markers or Plaques 11/97 11/97 94. Contractor Quality Control 11/97 11/97 95. Geotextile 10/98 10/98 96. Field Office 11/97 11/97 Return to Top of Page Vegetation 204. Sodding 4/00 Not Developed Not Developed 707. Digging, Transporting, Planting, and Establishment of Trees, Shrubs and Vines 8/94 Not Developed Not Developed 750. Use of Woody Plantings for Streambank Stabilization 4/00 Not Developed Not Developed 751. Use of Grasses for Streambank Stabilization 4/00 Not Developed Not Developed 752. Stripping, Stockpiling, Site Preparation and Spreading Topsoil 8/94 Not Developed Not Developed Return to Top of Page
NRCS IL April 2000
urbcsls2.doc