Instructions For Use of Construction Specification 8

MOBILIZATION AND DEMOBILIZATION

 

1. APPLICABILITY

Construction Specification 8 is applicable to any construction contract that includes a bid item for general mobilization and demobilization of the Contractor's personnel and equipment. It is not intended to cover mobilization and demobilization of special equipment for specific items of work, such as grouting equipment, pile driving equipment, rock drilling equipment, etc., for which payment for mobilization and demobilization is included and provided by specific bid items elsewhere in the contract.

2. MATERIAL SPECIFICATION

There are no material specifications complementary to Construction Specification 8.

3. ITEMS TO BE INCLUDED IN CONTRACT SPECIFICATIONS AND DRAWINGS

a. Special requirements pertaining to mobilization and demobilization, if any.

b. Any particular work for which payment will or will not be made under the mobilization and demobilization item if not adequately described by the specification.

c. When more than one site(s) (work limits not continuous) are included in the contract, include in Section 4 of this specification if mobilization of contractor's equipment and personnel between sites are included or not included in Section 3, Payment.

4. Discussion of Methods

No Methods are outlined in the Specification.