Home      Table of Contents

To Print Use The PDF File

 

LIST OF CONSTRUCTION SPECIFICATIONS AND INSTRUCTIONS FOR USE
 (Alphabetical)

 

Construction Specification Name Number Specification Instructions For Use
Chain Link Fence 91
Channel Clearing and Shaping  4
Clay Pipe 43
Clearing 1
Clearing and Grubbing 2
Concrete for Major Structures  31
Concrete Pipe Conduits and Drains 42
Concrete Repair 35
Construction Surveys 7
Contractor Quality Control  94
Corrugated Metal Pipe 51
Corrugated Polyethylene Tubing 44
Digging, Transporting, Planting and Establishment of Trees, Shrubs and Vines 707 Not Developed
Not Developed
Diversions and Waterways 27
Drainfill 24
Ductile-Iron Pipe 53
Earthfill 23
Excavation 21
Field Fence 92
Field Office 96
Geotextile 95
Grouted Rock Riprap 62
Identification Markers or Plaques 93
Lime-Treated Earthfill 28
Metal Fabrication and Installation 81
Mobilization and Demobilization 8
Painting Metalwork 82
Painting Wood 84
Piling 13
Plastic Pipe 45

Pollution Control 

5

Pressure Grouting 

14
Reinforced Concrete Pressure Pipe Conduits  41
Relief Wells  12
Removal of Water  11
Rockfill  25

Rock Riprap 

61
Seeding, Sprigging and Mulching  6
Shotcrete  33
Sodding  204 Not Developed
Not Developed
Soil-Cement  29
Steel Pipe  52
Steel Reinforcement  34

Stripping, Stockpiling, Site Preparation and Spreading Topsoil 

752 Not Developed
Not Developed
Structure Concrete  32
Structure Removal  3
Tile Drains  46
Timber Fabrication and Installation  83

Topsoiling 

26
Traffic Control  9
Treatment of Rock Surfaces  63
Use of Grasses for Streambank Stabilization  751 Not Developed
Not Developed
Use of Woody Plantings for Streambank Stabilization  750 Not Developed
Not Developed

Water Control Gates 

71
Water for Construction  10
Wire Mesh Gabions and Mattresses Twisted (Woven) or Welded Mesh 64

 

 

NRCS IL October 2001

urbcsls1.doc