|
CO2 Pellets
Economics
- A capital investment of $170,000 to $250,000 is necessary for the
pelletizer. More sophisticated models may cost upwards of $400,000.
These costs do not include expenses for auxiliary equipment or
installation.
- Moore quotes a cost of $2/sq. ft. for removing 40 sq. ft. of Organotin
antifoulant paint from the hull of a LCM by CO2 blasting. This
cost is significantly less than the estimated cost of using chemical
strippers and/or manual methods. The CO2 blasting required about
35 minutes.
State Information |
Glossary |
Conversion Checklist |
Comments
Home |
Process Advisor |
Alternatives |
Links |
Search
All SAGE material, Copyright© 1992,
Research Triangle Institute
Last Update:
18 March 1995
sage@rti.org
http://clean.rti.org/alt.cfm?id=pe&cat=ec
|
|
|