TABLE 2.1 PRACTICE SELECTION GUIDE |
1 = Slight Impact |
|||||||||||||||
|
|
|
PROBLEMS |
|||||||||||||
NAME |
CODE |
BRIEF DEFINITION |
Sheet & Rill Erosion |
Rill & Gully Erosion |
Streambank Erosion |
Stream Channel Erosion |
Toxics & Salt Reducion |
Flooding |
Increased Peak Flow |
Nutrient Pollution |
Pesticide Pollution |
Sediment Damage |
Dust Control |
Construction Road Maintenance |
Water Table Control |
Organic Pollution |
800 |
Constructed wetland to improve stormwater quality |
|
|
|
3 |
3 |
3 |
3 |
3 |
3 |
3 |
|
|
3 |
3 |
|
806 |
Stabilize temporary roads to reduce erosion |
|
3 |
|
|
|
|
|
|
|
2 |
2 |
3 |
|
|
|
808 |
Temporary sediment filter at culvert inlets |
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
815 |
Channel and ridge constructed to collect and divert runoff |
2 |
2 |
1 |
|
1 |
1 |
|
1 |
1 |
1 |
|
|
|
|
|
820 |
Perimeter dike to manage and divert runoff |
2 |
2 |
1 |
|
1 |
1 |
|
1 |
1 |
1 |
|
|
|
|
|
825 |
Controlling dust on construction sites and roads |
1 |
|
|
|
1 |
|
|
|
|
|
3 |
1 |
|
|
|
830 |
Preformed organic or inorganic erosion mat |
2 |
|
1 |
1 |
|
|
|
1 |
1 |
2 |
1 |
|
|
|
|
835 |
Vegetated filter zone to remove pollutants |
|
|
2 |
|
1 |
|
|
1 |
1 |
2 |
|
|
|
|
|
840 |
Natural or constructed channel vegetated to convey water |
|
2 |
|
2 |
|
1 |
|
1 |
1 |
1 |
|
|
1 |
|
|
841 |
Structure for collecting and storing water, debris, or sediment |
|
3 |
|
3 |
|
2 |
2 |
2 |
2 |
2 |
|
|
2 |
|
|
842 |
Structure for collecting and storing water, debris, or sediment |
|
3 |
|
3 |
|
3 |
3 |
3 |
3 |
3 |
|
|
3 |
|
|
847 |
Pits or trenches designed to hold water to increase infiltration |
1 |
1 |
|
|
|
1 |
1 |
1 |
1 |
|
|
|
|
|
|
850 |
Temporary sediment control barrier at storm drain inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
855 |
Excavated area to trap sediment at storm drain inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
860 |
Temporary practice to control sediment at storm drain inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
861 |
Temporary sediment control barrier at storm drain inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
862 |
Sediment filter using sod around a storm drain drop inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
863 |
Temporary practice to control sediment at storm drain inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
865 |
Smoothing surface to planned grade to improve site |
2 |
2 |
|
|
|
1 |
|
1 |
1 |
1 |
|
2 |
|
|
|
870 |
Structure to spread water flow uniformly |
1 |
1 |
1 |
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
875 |
Placing materials to protect soil surface |
2 |
2 |
1 |
|
|
|
1 |
2 |
2 |
2 |
2 |
|
|
|
|
880 |
Establishing permanent vegetative cover |
3 |
3 |
2 |
|
2 |
2 |
2 |
3 |
3 |
3 |
3 |
1 |
|
|
|
890 |
Pavement having interspersed sod, gravel, or sand areas |
1 |
1 |
|
|
|
1 |
1 |
1 |
1 |
|
|
|
|
|
|
895 |
Container for trapping sediment from runoff water |
|
|
|
|
|
|
|
1 |
1 |
2 |
|
|
|
|
|
900 |
Structure to control roadway erosion |
|
1 |
|
|
|
1 |
|
|
|
1 |
|
2 |
|
|
|
905 |
Structure to control erosion in ditch or grass swale |
|
3 |
|
|
|
|
|
|
|
2 |
|
|
|
|
|
910 |
Rocked area at outlets to reduce flow erosion |
|
2 |
|
2 |
|
|
|
|
|
1 |
|
|
|
|
|
920 |
Temporary sediment barrier of filter fabric |
2 |
2 |
|
|
|
|
|
1 |
1 |
2 |
|
|
|
|
|
925 |
Laying blanket of established turf to protect area |
3 |
3 |
2 |
|
1 |
2 |
2 |
3 |
3 |
3 |
3 |
1 |
|
|
|
930 |
Rock pad at entrance or exit to control tracking of mud to streets |
|
|
|
|
|
|
|
|
|
1 |
|
3 |
|
|
|
935 |
Bale barrier to trap sediment from runoff |
2 |
2 |
|
|
|
|
|
1 |
1 |
2 |
|
|
|
|
|
940 |
Structure to control streambank erosion |
|
|
3 |
|
|
|
|
|
|
2 |
|
|
|
|
|
945 |
An underground water collection and transport tube |
1 |
1 |
2 |
|
2 |
1 |
2 |
1 |
1 |
1 |
|
2 |
3 |
|
|
950 |
Temporary pit to trap and filter water |
|
|
|
|
|
|
|
2 |
2 |
2 |
|
|
|
|
|
953 |
Grooving, stair stepping, or tracking across a slope |
1 |
1 |
|
|
|
|
1 |
|
|
1 |
|
|
|
|
|
955 |
Temporary diversion for runoff control |
2 |
2 |
1 |
|
1 |
1 |
|
1 |
1 |
1 |
|
|
|
|
|
960 |
Temporary ponding basin to trap sediment |
|
1 |
|
|
|
|
1 |
1 |
1 |
2 |
|
|
|
|
|
965 |
Planting vegetation to protect areas from erosion |
3 |
2 |
2 |
|
2 |
2 |
2 |
2 |
2 |
2 |
2 |
|
|
|
|
970 |
Short term water conveyance down a sloping area |
|
2 |
|
|
|
|
|
1 |
1 |
1 |
|
1 |
|
|
|
975 |
Short term stream crossing for equipment |
|
|
1 |
1 |
|
|
|
|
|
|
|
2 |
|
|
|
980 |
Temporary excavated drainageway to control runoff |
|
1 |
|
1 |
|
1 |
|
1 |
1 |
1 |
|
|
|
|
|
981 |
Adding or replacing quality soil to the surface |
2 |
1 |
|
|
2 |
1 |
1 |
1 |
1 |
1 |
|
|
|
|
|
984 |
Protecting contiguous stands of trees from construction damage |
2 |
2 |
2 |
|
|
2 |
1 |
3 |
3 |
1 |
2 |
|
1 |
|
|
985 |
Planting trees and shrubs |
3 |
3 |
3 |
|
2 |
1 |
2 |
3 |
3 |
3 |
3 |
|
2 |
|
|
990 |
Protecting individual trees from construction damage |
1 |
1 |
1 |
|
|
1 |
1 |
1 |
1 |
1 |
1 |
|
1 |
|
|
991 |
Protecting individual trees from underground construction damage |
1 |
1 |
1 |
|
|
1 |
1 |
1 |
1 |
1 |
1 |
|
1 |
|
|
995 |
Vegetation to control streambank erosion |
|
|
3 |
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
996 |
Permanent sealing of a water well, boring, or monitoring well |
|
|
|
|
|
|
|
3 |
3 |
|
|
|
|
3 |
|
|
1 = Slight Impact |
|||||||||||||||
|
October 2001 |