# 9 in a series of 10 case studies
House Museum Villanova, PA
How specifications were used to reduce construction waste
The specifications required that the following items be
salvaged, reused, or recycled: tree limbs, wood, concrete, asphalt paving,
stone masonry, gravel, and metals. The specifications also required the
successful bidder to submit a waste management plan. Bidders were provided
with a list of local recycling firms for information only. |
|
Project DescriptionRenovation of house museum; public/private
venture
Building Size10,000 square feet
Project Status at Time of PublicationProject complete
Waste ImpactProject waste was reduced
Project Costs reduced
stayed the same
increased
Local Landfill Fee$60/ton
ContactJeffrey Levine John Milner Associates 309 N. Matlack
Street West Chester, PA 19380 610-436-9000
|