B. Management Measure for Chemical and Pollutant Control
- Limit application, generation, and migration of toxic substances;
- Ensure the proper storage and disposal of toxic materials; and,
- Apply nutrients at rates necessary to establish and maintain vegetation without
causing significant nutrient
runoff to surface waters.
This management measure is intended to be applied by States to the construction of
new dams, as well as to construction
activities associated with the maintenance of dams. Dams are defined as constructed
impoundments which are either:
- 25 feet or more in height and greater than 15 acre-feet in capacity, or
- 6 feet or more in height and greater than 50 acre-feet in capacity.
This management measure addresses fuel and chemical spills associated with dam
construction, as well as concrete washout
and related construction activities. Under the Coastal Zone Act Reauthorization
Amendments of 1990, States are subject
to a number of requirements as they develop coastal NPS programs in conformity with
this measure and will have some
flexibility in doing so. The application of management measures by States is described
more fully in Coastal Nonpoint
Pollution Control Program: Program Development and Approval Guidance,
published jointly by the U.S.
Environmental Protection Agency (EPA) and the National Oceanic and Atmospheric
Administration (NOAA) of the U.S.
Department of Commerce.
The purpose of this management measure is to prevent downstream contamination
from pollutants associated with dam
construction activities.
Although suspended sediment is the major pollutant generated at a construction site
(USEPA, 1973), other pollutants
include:
- Pesticides - insecticides, fungicides, herbicides, rodenticides;
- Petrochemicals - oil, gasoline, lubricants, asphalt;
- Solid wastes - paper, wood, metal, rubber, plastic, roofing materials;
- Construction chemicals - acids, soil additives, concrete-curing compounds;
- Wastewater - aggregate wash water, herbicide wash water, concrete-curing water,
core-drilling wastewater, or clean-up
water from concrete mixers;
- Garbage;
- Cement;
- Lime;
- Sanitary wastes; and
- Fertilizers.
A complete discussion of these pollutants can be found in Chapter 4 of this guidance.
This management measure was selected because most erosion and sediment control
practices are ineffective at retaining
soluble NPS pollutants on a construction site. Many of the NPS pollutants, other than
suspended sediment, generated at a
construction site are carried offsite in solution or attached to clay particles in runoff
(USEPA, 1973). Some metals (e.g.,
manganese, iron, and nickel) attach to sediment and usually can be retained onsite.
Other metals (e.g., copper, cobalt, and
chromium) attach to fine clay particles and have greater potential to be carried offsite.
Insoluble pollutants (e.g., oils,
petrochemicals, and asphalt) form a surface film on runoff water and can be easily
washed away (USEPA, 1973).
A number of factors that influence the pollution potential of construction chemicals have
been identified (USEPA, 1973).
These include:
- The nature of the construction activity;
- The physical characteristics of the construction site; and
- The characteristics of the receiving water.
Dam construction sites are particularly sensitive areas and have the potential to
severely impact surface waters with runoff
containing construction chemical pollutants. Because dams are located on rivers or
streams, pollutants generated at these
construction sites have a much shorter distance to travel before entering surface
waters. Therefore, chemicals and other NPS
pollutants generated at a dam construction site should be controlled.
As explained more fully at the beginning of this chapter and in Chapter 1, the following practices are described for
illustrative purposes only. State programs need not require the implementation of
these practices. However, as a practical
matter, EPA anticipates that the management measure set forth above generally will be
implemented by applying one or more
management practices appropriate to the source, location, and climate. The practices
set forth below have been found by
EPA to be representative of the types of practices that can be applied successfully to
achieve the management measure
described above.
Practices for the control of erosion and sediment loss are discussed in Chapter 4 of this guidance and should be
considered
applicable to this management measure.
a. Develop and implement a spill prevention and control plan. Agencies,
contractors, and other commercial
entities associated with the dam construction project that store, handle, or
transport fuel, oil, or hazardous
materials should have a spill response plan, especially if large quantities of oil
or other polluting liquid
materials are used.
Spill procedure information should be posted, and persons trained in spill handling
should be onsite or on call at all times.
Materials for cleaning up spills should be kept onsite and easily available. Spills
should be cleaned up immediately and the
contaminated material properly disposed of. Spill control plan components should
include (Peters, 1978):
- Stopping the source of the spill;
- Containing any liquid;
- Covering the spill with absorbent material such as kitty litter or sawdust, but do not
use straw; and
- Disposing of the used absorbent properly.
b. Maintain and wash equipment and machinery in confined areas
specifically designed to control runoff.
Thinners or solvents should not be discharged into sanitary or storm sewer systems, or
surface water systems, when cleaning
machinery. Use alternative methods for cleaning larger equipment parts, such as
high-pressure, high-temperature water
washes or steam cleaning. Equipment-washing detergents can be used and wash
water discharged into sanitary sewers if
solids are removed from the solution first. Small parts should be cleaned with
degreasing solvents that can then be reused
or recycled. Do not discharge or otherwise dispose of any solvents into sewers, or into
surface waters.
Washout from concrete trucks should be disposed of into:
- A designated area that will later be backfilled;
- An area where the concrete wash can harden, can be broken up, and can then be
placed in a dumpster; or
- A location not subject to surface water runoff and more than 50 feet away from a
receiving water.
Never dump washout directly into surface waters or into a drainage leading to surface
waters.
c. Establish fuel and vehicle maintenance staging areas located away from
surface waters and all drainages
leading to surface waters, and design these areas to control runoff.
d. Store, cover, and isolate construction materials, refuse, garbage,
sewage, debris, oil and other petroleum
products, mineral salts, industrial chemicals, and topsoil to prevent runoff of
pollutants and contamination
of ground water.