Section 258.71 FINANCIAL ASSURANCE FOR CLOSURE

Previous Section | 258 Contents | Next Section

Performance Standard:

258.71(a) The owner or operator must have a detailed written estimate, in current dollars, of the cost of hiring a third party to close the largest area of all MSWLF units ever requiring a final cover as required under sec. 258.60 at any time during the active life in accordance with the closure plan. The owner or operator must notify the State Director that the estimate has been placed in the operating record.

258.71(a)(1) The cost estimate must equal the cost of closing the largest area of all MSWLF units ever requiring a final cover at any time during the active life when the extent and manner of its operation would make closure the most expensive, as indicated by its closure plan (see sec. 258.60(c)(2) of this part).

258.71(a)(2) During the active life of the MSWLF unit, the owner or operator must annually adjust the closure cost estimate for inflation.

258.71(a)(3) The owner or operator must increase the closure cost estimate and the amount of financial assurance provided under paragraph (b) of this section if changes to the closure plan or MSWLF unit conditions increase the maximum cost of closure at any time during the remaining active life.

258.71(a) (4) The owner or operator may reduce the closure cost estimate and the amount of financial assurance provided under paragraph (b) of this section if the cost estimate exceeds the maximum cost of closure at any time during the remaining life of the MSWLF unit. The owner or operator must notify the State Director that the justification for the reduction of the closure cost estimate and the amount of financial assurance has been placed in the operating record.

258.71(b) The owner or operator of each MSWLF unit must establish financial assurance for closure of the MSWLF unit in compliance with sec. 258.74. The owner or operator must provide continuous coverage for closure until released from financial assurance requirements by demonstrating compliance with sec. 258.60(h) and (i).

  About EPA | Other Info | State Data | State Profiles | Waste Generation | Waste Disposal | Waste Components
International Practices | Source Reduction | Recycling | Combustion | Land Disposal

[ Top of Screen ]

 

 

Last Revised: November 14, 1997

comments: levy.steve@epamail.epa.gov

URL: www.epa.gov/epaoswer/non-hw/muncpl/factbook/internet/lanf/258t71.htm

OSW Home www.epa.gov/epaoswer/osw/index.htm

EPA Home www.epa.gov/epahome

Search the EPA Web www.epa.gov/epahome/search.html